Blast Management Plan Template

The Blast Management Plan together with the CMPA’s Shot Firers Record Book [CMPA 1340] aims to meet the requirements set out in section 130 of the Dangerous Goods (Explosives) Regulations 2011 and appendix 2 of AS 2187-2-2006 Explosives Use and Storage Part 2: Use of explosives.

Dust Management Guidelines

This Guideline together with the CMPA’s Work Safely Reference Manual aims to support CMPA members in meeting the requirements of the Victorian Occupational Health and Safety Act 2004 and the Victorian Environment Protection Act 1970. The CMPA endeavours to:

  • Provide members with appropriate management practices required to minimise potential health risks or environmental impacts associated with airborne dust arising from extractive industry operations; and
  • Assist members in establishing and maintaining a Work Plan that defines operational activity so as to obtain and sustain an Extractive Industry Work Authority.

Guarding Guidelines

This document demonstrates a process that can be used to establish and successfully implement plant and equipment guarding specific to your site requirements. It aims to support members in meeting the requirements of the Victorian Occupational Health and Safety Act 2004.

Noise Management Guidelines

This Guideline together with the CMPA’s Work Safely Reference Manual aims to support CMPA members in meeting the requirements of the Victorian Occupational Health and Safety Act 2004 and the Victorian Environment Protection Act 1970. The CMPA endeavours to:

  • Provide members with appropriate management practices required to minimise potential health risks or environmental impacts associated with noise arising from construction materials industry operations; and
  • Assist members in establishing and maintaining a Work Plan that defines operational activity so as to obtain and sustain an Extractive Industry Work Authority.

Traffic Management Guidelines

This document demonstrates how a risk management process can be used to establish and successfully implement a traffic management plan specific to your site requirements. Together with the CMPA’s Work Safely Reference Manual it aims to support members in meeting the requirements of the Victorian Occupational Health and Safety Act 2004.

Working Safely with Geotechnical Risk in Quarries

This Guideline together with the CMPA’s Work Safely Reference Manual aims to support CMPA members in meeting the requirements of the Victorian Occupational Health and Safety Act 2004 by ensuring that:

  • Geotechnical hazards associated with quarry ground movement and quarry operations are identified, assessed where required and then controlled in a manner to reduce the risk of personal or vehicle engulfment; and
  • Quarry infrastructure is established in a manner so as to prevent vehicles that have lost control, or persons working close to edges from falling to another level.